A full renovation of a 100 m² flat in Estepona usually lasts 10 to 14 weeks of works plus permit time. A villa takes 16 to 30 weeks. The real timeline depends on permits, bespoke joinery and finish decisions arriving on time.

How is the time split by phase?

PhaseIndicative duration (100 m² flat)
Visit, quote and contract1–2 weeks
Permit or responsible declarationImmediate to 6 weeks
Demolition and masonry2–3 weeks
Installations (electrics, plumbing, climate)2–3 weeks
Tiling, flooring and plasterboard2–3 weeks
Joinery, kitchen and bathrooms2–3 weeks
Painting, cleaning and handover1 week

What delays a renovation most?

  • Scope changes during the works
  • Late orders of joinery, fittings and kitchens
  • Major works permits or community approvals
  • Hidden surprises such as damp or obsolete installations
  • Client decisions on finishes arriving late

How do you protect your schedule?

Close the specification before starting, order anything with a manufacturing lead time at signing and demand a shared weekly schedule. Review milestones weekly with photos to catch deviations early.

Is the deadline signed?

It should be signed in the works contract with start and handover dates and clear delay terms. At La Rada the deadline and price are in writing and follow-up is weekly.

Frequently asked questions

How long does it take to renovate a 100 m² flat?

Between 10 and 14 weeks of works, plus the permit if required.

How long does a villa renovation take?

Between 16 and 30 weeks of works, plus permits that can add 3 to 6 months.

Can a renovation be sped up?

Partly: by processing the permit while designing, ordering materials early and avoiding changes during the works.

R